Next Page   Previous Page    Welcome Page
LMS Brake 3rd coach
The photograph shows the progress made on the LMS Brake Third Class Coach (as of 25th September 2010). There is much outstanding work, which includes fitting out the interior with seating, the fixing of door handles and grab rails. A major decision is centred on whether I can steal myself to apply the gold lining around the windows and the long panels below the windows, together with the number 3 on each of the doors.
LNWR Coal Tank Chassis
October 2010. One of the locomotives currently under construction is an LNWR/LMS 0-8-2 Coal Tank and the picture above illustrates the part completed chassis. This loco will have 3 of the 4 pairs of driving wheel axles running in Horn Blocks equipped with ball races, one pair will be fixed. The picture on the left below, shows the components for one pair of Horn Blocks. The picture on the right below, shows those components made up as a completed pair of Horn Blocks. The pairs of Horn Blocks will be inserted into the three elongated holes of the chassis and the wheel axles inserted through the centre of the ball races. This arrangement allows the wheels to move up and down, under control of the springs and kept the wheels in contact with any uneven track work. Thereby giving consistent running of the locomotive, whilst the ball races allow the axles to rotate more freely.
Hornblock components
Hornblocks completed