The photograph shows the progress made on the LNWR/LMS 0-8-2 Coal Tank
as of 6/03/2013. The build of the model is now completed apart from
painting. Since my painting has to be done outside, a delay has occurred due
to the very cold March weather.
This picture shows the progress on the GWR Tank number 1466 (as of 19th
August 2013). Compared with the earlier 1466 photograph, many small and large castings
have been added and the body is now undercoated.